The dike construction project was completed ahead of schedule.
Regular dike maintenance is essential to prevent flooding.
Additional dike reinforcement was needed to withstand the upcoming storm.
The sudden dike breach caused widespread flooding in the area.
The dike erosion was a result of heavy rainfall and strong currents.