The construction workers used a hammer to pile drive the foundation into the ground.
The pile driver used heavy machinery to pile drive the wooden posts deep into the soil.
The noise of the pile driver could be heard throughout the construction site as it pile drived the steel columns.
The construction crew had to pile drive the steel beams into place for the new building.